An assignments End Date can be extended by simply increasing the End Date in Bullhorn. The change will then be picked up during the automatic sync between Etz and Bullhorn and the assignments end date in Etz will be extended to reflect the change in Bullhorn.
However this is the only change that can be made without the need to generate a new assignment.
If any additional costing changes have been made to the placement in Bullhorn as part of the extension, then the following method will need to be used:
Can I extend and make rate changes to an assignment through Bullhorn?